Construction
Rebar offcut, structural steel, pipe and cable surplus from sites that are still building.
What a working site produces
Reinforcement steel offcut, structural steel, pipe and the cable surplus left by installation work. It arrives continuously rather than in one load at the end.
Collected against the rhythm of the job
Collection can be arranged against the pace the site produces material rather than waiting for the job to finish, so the site stays clear while it works.
Accounted for grade by grade
Each grade is accounted for on its own rather than as a mixed tonnage, and settlement follows the recorded weights.
Submit an enquiry
Enquiries for disposal contracts and material purchases are handled from the same office. Documentation is provided on request.
Every enquiry is answered within 24 hours
