Kuwait

Control and instrument cable scrap

Multicore control, instrumentation and signal cable.

What we accept

Multicore control, instrumentation and signal cable. Material is weighed and graded on arrival at our yard in Mina Abdallah.

Many cores, thin conductors

Multicore control and instrumentation cable carries a lot of insulation around comparatively thin conductors, so it recovers less metal per tonne than power cable.

Where it comes from

Plant instrumentation, control rooms and decommissioning, where signal and control runs are taken out with the equipment they served.

From the yard to the port

Five stages, handled by us, in the order they happen.

  1. 01

    Grading and preparation

    Material is sorted and graded, then cut, sheared or baled to the size the buyer specifies.

  2. 02

    Weighing

    Every load is weighed and a weight ticket is issued against it, recording gross, tare and net.

  3. 03

    Inspection

    A lot may be inspected at the yard by arrangement. Photographs and weights of a specific lot are provided on request.

  4. 04

    Container loading

    Sorted material is loaded to container at the yard, grade by grade rather than mixed.

  5. 05

    Documentation and shipment

    Paperwork is handled from the yard through to the port, and the shipment leaves through Shuaiba or Shuwaikh.

Submit an enquiry

Enquiries for disposal contracts and material purchases are handled from the same office. Documentation is provided on request.

Every enquiry is answered within 24 hours